As some of you may know we've moved house last year, but there was no garage/workspace for me so a new one had to be built
After a long search I found a contractor that looked and sounded decent and made me a good price, cheapest and dearest offer were abou 1-5
so most expensive was 5 x the price of cheapest

Now I didn't opt for the cheapest but went for someone that looked trustworthy to me and didn't want any money before he even delivered anything,
We already had made a concrete foundation late last year with a couple of friends, 30cm thick concrete slab with two 10mm nets in it, to be sure to have a good base
First delivery of some materials on aug 1st

After a days work of my crew

This was on aug 5


start of week two


Wednesday of week two the concrete elements for the right hand side (roof) and leftside 1st floor were put up

As some of you may know we've moved house last year, but there was no garage/workspace for me so a new one had to be built
After a long search I found a contractor that looked and sounded decent and made me a good price, cheapest and dearest offer were abou 1-5

so most expensive was 5 x the price of cheapest


Now I didn't opt for the cheapest but went for someone that looked trustworthy to me and didn't want any money before he even delivered anything,
We already had made a concrete foundation late last year with a couple of friends, 30cm thick concrete slab with two 10mm nets in it, to be sure to have a good base
First delivery of some materials on aug 1st

After a days work of my crew

This was on aug 5


start of week two


Wednesday of week two the concrete elements for the right hand side (roof) and leftside 1st floor were put up